June at the Shipyard

DSCF6829 new keel in place aft with new framing going into place (640×480)

By Schooner Ernestina-Morrissey Association | Published August 18, 2016 | Full size is 640 × 480 pixels

The new keel looking forward.  The grey scarfed section is one of the lead ballast sections.  The keel is beveled to receive the garboard.  The right side shows the dead wood with the stern frames attached.  At the upper left you can see into the forward section of the ship.  Between is a temporary platform to support the construction process.

DSCF6826 new keel in place under forward section of hull (640x480) DSCF6828 new keel in place aft (480x640)

The new keel looking forward. The grey scarfed section is one of the lead ballast sections. The keel is beveled to receive the garboard. The right side shows the dead wood with the stern frames attached. At the upper left you can see into the forward section of the ship. Between is a temporary platform to support the construction process.

Bookmark the permalink.