Rig Inspection Progresses
Steve inspected the main masthead last week.
-
With the rig maintenance on-going I thought you would like to review some history of Ernestina’s present rig. These are links to the archived pre-2005 website developed by Captain Gregg Swanzey.
1994 constructing fore mast
fall 2002 de-rigging for inspection and maintenance
spring 2003 stepping masts
This entry was posted in Maintenance, News. Bookmark the permalink.
← Winter Cover Off! | Rig Inspection News →